Compiled on 28 September 2026 from the tender documentation as summarised to us, against the design sections of this book. Where we've read an allowance wrongly, please correct us — the aim is one agreed list before selections are finalised.
The design sections this touches: flooring (05), the bathrooms (10c–10f), the kitchen (05, 06) and the entry (11).