Furniture is illustrative: the built-in chaise replaces the freestanding sun lounger (25 Oct 2026); the umbrella, cushions, pots. The pictures are AI-enhanced images, not photographs; the stepping pads to the plant gate are not shown in them. John's sourced surround and tiles to follow.
The pool is a separate contract with South Pacific Pools: a concrete tiled pool with a salt chlorinator and automatic doser, an ozone purifier, a heat pump, two lights, an underground blanket, a pool cleaner and a water leveller; the shell was sprayed in September 2026. It excludes the equipment housing and rubbish removal, and includes one month of temporary fencing. Matched against the quote on 6 Oct 2026.